Ships & Contract Cover

The mix of ship sizes within our fleet provides flexibility to deploy our vessels on a wide range of trading routes.

Global Ship Lease owns 68 containerships, ranging from 2,207 to 11,040 TEU, with a combined capacity of 375,406 TEU. 36 ships are wide-beam Post-Panamax.

Fleet and charter data last updated December 31, 2023. In case of unintended discrepancies with fleet and charter details shown in our most recent earnings release, the earnings release shall take precedence.

 

= Firm Employment = Option Period
Vessel Name
Size (TEU)
Charterer
Rate
Contract Cover
11,040
CMA CGM
$47,200

Built: 2008

Yard: Daewoo

TEU - Nominal: 11,040

TEU - 14 mt: 7,990

Reefers: 700 

LWT: 38,577

Flag: Malta

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q25

Latest Charter Expiry: 2Q26

Additional Information

Bulbous bow optimized for fuel efficiency at low operating speeds. Ship has sufficient onboard power to support significant up-sizing of reefer capacity

Image of   CMA CGM Thalassa
9,115
ZIM
$65,000

Built: 2015

Yard: Hanjin

TEU - Nominal: 9,115

TEU - 14 mt: 7,578

Reefers: 1500

LWT: 31,764

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q27

Latest Charter Expiry: 4Q27

Additional Information

On November 22, 2021, we announced the forward fixture of the vessel, upon the expiry of its existing charter in the second or third quarter of 2022, to a leading liner operator for approximately five years at a charter rate of $65,000 per day.

Image of   ZIM Norfolk
9,115
MSC

Built: 2015

Yard: Hanjin

TEU - Nominal: 9,115

TEU - 14 mt: 7,578

Reefers: 1,500

LWT: 31,890

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q25

Latest Charter Expiry: 4Q25

Additional Information

Ship has sufficient onboard power to support significant upsizing of reefer capacity. Chartered at a rate expected to generate approximately $11.8 million of annualized Adjusted EBITDA.

Image of   Anthea Y
9,115
ZIM
$65,000

Built: 2015

Yard: Hanjin

TEU - Nominal: 9,115

TEU - 14 mt: 7,578

Reefers: 1,500

LWT: 31,820

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q27

Latest Charter Expiry: 4Q27

Additional Information

On November 22, 2021, we announced the forward fixture of the vessel, upon the expiry of its existing charter in the second or third quarter of 2022, to a leading liner operator for approximately five years at a charter rate of $65,000 per day.

Image of   ZIM Xiamen
8,603
MSC

Built: 2005

Yard: Samsung

TEU - Nominal: 8,603

TEU - 14 mt: 6590

Reefers: 710

LWT: 34,325

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q27

Latest Charter Expiry: 4Q27

Additional Information

Ship has sufficient onboard power to support significant up-sizing of reefer capacity. Chartered at $19,000 per day until next scheduled drydock in 2Q/3Q2024. Thereafter, chartered at a rate expected to generate approximately $5.9 million of annualized Adjusted EBITDA.

Image of   MSC Tianjin
8,603
MSC

Built: 2004

Yard: Samsung

TEU - Nominal: 8,603

TEU - 14 mt: 6,590

Reefers: 710

LWT: 34,305

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q27

Latest Charter Expiry: 3Q27

Additional Information

Ship has sufficient onboard power to support significant up-sizing of reefer capacity. Chartered at $23,000 per day until next scheduled drydock in 2Q/3Q 2024. Thereafter, chartered at a rate expected to generate approximately $8.1 million of annualized Adjusted EBITDA.

Image of   MSC Qingdao
8,603
MSC

Built: 2004

Yard: Samsung

TEU - Nominal: 8,603

TEU - 14 mt: 6,590

Reefers: 710

LWT: 34,340

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q27

Latest Charter Expiry: 4Q27

Additional Information

Chartered to mid-July 2023 at $22,500 per day; thereafter chartered for 48 – 52 months at a rate expected to generate approximately $16.5 million average annualized EBITDA

Image of   GSL Ningbo
8,544
Maersk

Built: 2004

Yard: N/A

TEU - Nominal: 8,544

TEU - 14 mt: N/A

Reefers: 847

LWT: 37,777 

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design): No

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q25

Latest Charter Expiry: 3Q26

Additional Information

Delivered as part of a four-vessel package (GSL Lydia / Effie / Sofia / Alexandra) in 2Q2023, and chartered to a leading liner company. Contract cover for each vessel is for a minimum firm period of 24 months from the date of delivery, with charterers holding one year extension options. Collectively, the vessels are expected to generate aggregate Adjusted EBITDA of approximately $76.6 million over the minimum firm period, increasing to approximately $95.3 million if all options are exercised.

Image of   GSL Alexandra
8,544
Maersk

Built: 2003

Yard: N/A

TEU - Nominal: 8,544

TEU - 14 mt: N/A

Reefers: 847

LWT: 37,777

Flag: Liberia

Post-Panamax 

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q25

Latest Charter Expiry: 3Q26

Additional Information

Delivered as part of a four-vessel package (GSL Lydia / Effie / Sofia / Alexandra) in 2Q2023, and chartered to a leading liner company. Contract cover for each vessel is for a minimum firm period of 24 months from the date of delivery, with charterers holding one year extension options. Collectively, the vessels are expected to generate aggregate Adjusted EBITDA of approximately $76.6 million over the minimum firm period, increasing to approximately $95.3 million if all options are exercised.

Image of   GSL Effie
8,544
Maersk

Built: 2003

Yard: N/A

TEU - Nominal: 8,544

TEU - 14 mt: N/A

Reefers: 847

LWT: 37,777

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q25

Latest Charter Expiry: 3Q26

Additional Information

Delivered as part of a four-vessel package (GSL Lydia / Effie / Sofia / Alexandra) in 2Q2023, and chartered to a leading liner company. Contract cover for each vessel is for a minimum firm period of 24 months from the date of delivery, with charterers holding one year extension options. Collectively, the vessels are expected to generate aggregate Adjusted EBITDA of approximately $76.6 million over the minimum firm period, increasing to approximately $95.3 million if all options are exercised.

Image of   GSL Lydia
8,544
Maersk

Built: 2003

Yard: N/A

TEU - Nominal: 8,544

TEU - 14 mt: N/A

Reefers: 847

LWT: 37,777

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q25

Latest Charter Expiry: 3Q26

Additional Information

Delivered as part of a four-vessel package (GSL Lydia / Effie / Sofia / Alexandra) in 2Q2023, and chartered to a leading liner company. Contract cover for each vessel is for a minimum firm period of 24 months from the date of delivery, with charterers holding one year extension options. Collectively, the vessels are expected to generate aggregate Adjusted EBITDA of approximately $76.6 million over the minimum firm period, increasing to approximately $95.3 million if all options are exercised.

Image of   GSL Sofia
7,847
Maersk
$18,900

Built: 2004

Yard: Hyundai

TEU - Nominal: 7,849

TEU - 14 mt: 6,038

Reefers: 814

LWT: 29,105

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q24

Latest Charter Expiry: 4Q24

Additional Information

 

Image of   GSL Kalliopi
7,847
Maersk
$17,750

Built: 2004

Yard: Hyundai

TEU - Nominal: 7,849

TEU - 14 mt: 6,038

Reefers: 814

LWT: 29,190

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q24

Latest Charter Expiry: 1Q25

Additional Information

 

Image of   GSL Grania
7,847
Maersk
$16,500

Built: 2004

Yard: Hyundai

TEU - Nominal: 7,849

TEU - 14 mt: 6,038

Reefers: 814

LWT: 29,261

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q24

Latest Charter Expiry: 1Q25

 

Image of   GSL Eleni
6,927
Hapag-Lloyd

Built: 2013

Yard: Hyundai

TEU - Nominal: 6,927

TEU - 14 mt: 5,120

Reefers: 1,200

LWT: 23,424

Flag: MI

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q28

Latest Charter Expiry: 1Q31

 

Additional Information

Chartered to CMA CGM through 3/4Q23 at $25,910 per day. Thereafter to be chartered to Hapag-Lloyd at a rate expected to generate approximately $13.1 million Adjusted EBITDA per year. Hapag-Lloyd have options to extend the charter for two further periods of 12 months each at the same rate.

Image of   Colombia Express
6,927

Built: 2013

Yard: Hyundai

TEU - Nominal: 6,927

TEU - 14 mt: 5,120

Reefers: 1,600

LWT: 23,421

Flag: MI

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q29

Latest Charter Expiry: 3Q31

Additional Information

Chartered to CMA CGM through 2/3Q24 at $25,910 per day. Thereafter to be chartered to Hapag-Lloyd at a rate expected to generate approximately $13.1 million Adjusted EBITDA per year. Hapag-Lloyd have options to extend the charter for two further periods of 12 months each at the same rate.
Image of   Kristina
6,927

Built: 2013

Yard: Hyundai

TEU - Nominal: 6,927

TEU - 14 mt: 5,120

Reefers: 1,600

LWT: 23,403

Flag: MI

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q29

Latest Charter Expiry: 2Q31

Additional Information

Chartered to CMA CGM through 1/2Q24 at $25,910 per day. Thereafter to be chartered to Hapag-Lloyd at a rate expected to generate approximately $13.1 million Adjusted EBITDA per year. Hapag-Lloyd have options to extend the charter for two further periods of 12 months each at the same rate.
Image of   Katherine
6,927

Built: 2013

Yard: Hyundai

TEU - Nominal: 6,927

TEU - 14 mt: 5,120

Reefers: 1,600

LWT: 23,348

Flag: MI

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q29

Latest Charter Expiry: 3Q31

Additional Information

Chartered to CMA CGM through 1/3Q24 at $25,910 per day. Thereafter to be chartered to Hapag-Lloyd at a rate expected to generate approximately $13.1 million Adjusted EBITDA per year. Hapag-Lloyd have options to extend the charter for two further periods of 12 months each at the same rate.
Image of   Alexandra
6,882

Built: 2015

Yard: Hanjin

TEU - Nominal: 6,882

TEU - 14 mt: 5,105

Reefers: 1,600

LWT: 23,919

Flag: MI

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q29

Latest Charter Expiry: 3Q31

Additional Information

Chartered to CMA CGM through 1/3Q24 at $25,910 per day. Thereafter to be chartered to Hapag-Lloyd at a rate expected to generate approximately $13.1 million Adjusted EBITDA per year. Hapag-Lloyd have options to extend the charter for two further periods of 12 months each at the same rate.
Image of   Alexis
6,882

Built: 2015

Yard: Hanjin

TEU - Nominal: 6,882

TEU - 14 mt: 5,105

Reefers: 1,600

LWT: 23,864

Flag: MI

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q29

Latest Charter Expiry: 2Q31

Additional Information

Chartered to CMA CGM through 1/2Q24 at $25,910 per day. Thereafter to be chartered to Hapag-Lloyd at a rate expected to generate approximately $13.1 million Adjusted EBITDA per year. Hapag-Lloyd have options to extend the charter for two further periods of 12 months each at the same rate.
Image of   Olivia I
6,840
OOCL
$20,500

Built: 2002

Yard: Samsung

TEU - Nominal: 6,840

TEU - 14 mt: 4,990

Reefers: 600

LWT: 27,954

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q24

Latest Charter Expiry: 4Q24

 

Image of   GSL Christen
6,840
Maersk
$35,750

Built: 2002

Yard: Samsung

TEU - Nominal: 6,840

TEU - 14 mt: 4,990

Reefers: 600

LWT: 28,070

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q24

Latest Charter Expiry: 1Q25

 

Image of   GSL Nicoletta
6,621
CMA CGM
$37,750

Built: 2001

Yard: Hanjin

TEU - Nominal: 6,621

TEU - 14 mt: 4,555

Reefers: 500

LWT: 26,776

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q25

Latest Charter Expiry: 2Q26

Additional Information

Chartered to CMA CGM at a rate of $34,000 per day through 4Q2021; thereafter, extended at a rate of $37,750 per day
Image of   CMA CGM Berlioz
6,572
MSC

Built: 2011

Yard: Hanjin

TEU - Nominal: 6,572

TEU - 14 mt: 5,002

Reefers: 500

LWT: 24,746

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q27

Latest Charter Expiry: 3Q27

Additional Information

Chartered at $20,000 per day until next scheduled drydock in 2Q/3Q 2024. Thereafter, forward fixed at a rate expected to generate approximately $5.9 million of annualized Adjusted EBITDA.
Image of   Agios Dimitrios
6,080
Maersk
$13,250

Built: 2004

Yard: Samsung

TEU - Nominal: 6,080

TEU - 14 mt: 4,527

Reefers: 500

LWT: 23,745

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q24

Latest Charter Expiry: 1Q25

Image of   GSL Christel Elisabeth
6,080
Maersk
$13,250

Built: 2004

Yard: Samsung

TEU - Nominal: 6,080

TEU - 14 mt: 4,527

Reefers: 500

LWT: 23,737

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q24

Latest Charter Expiry: 1Q25

Image of   GSL Vinia
6,008
Maersk
$18,600

Built: 2001

Yard: Samsung

TEU - Nominal: 6,008

TEU - 14 mt: 4,138

Reefers: 650

LWT: 24,414

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q24

Latest Charter Expiry: 1Q27

Additional Information

After the initial firm period of the charter, Maersk holds a one year extension option at $12,900 per day, followed by a second option at $12,700 per day with a period determined by - and terminating prior to – the vessel’s 25th year drydocking & special survey.

Image of   GSL Maria
6,008
Maersk
$18,600

Built: 2000

Yard: Samsung

TEU - Nominal: 6,008

TEU - 14 mt: 4,193

Reefers: 800

LWT: 24,873

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q24

Latest Charter Expiry: 4Q25

Additional Information

GSL Violetta is chartered to Wan Hai until December 2021. Thereafter she is chartered to Maersk. After the initial firm period of the charter, Maersk holds a one year extension option at $12,900 per day, followed by a second option at $12,700 per day with a period determined by - and terminating prior to – the vessel’s 25th year drydocking & special survey.

Image of   GSL Violetta
6,008
Maersk
$18,600

Built: 2000

Yard: Samsung

TEU - Nominal: 6,008

TEU - 14 mt: 4,194

Reefers: 800

LWT: 24,859

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q24

Latest Charter Expiry: 1Q26

Additional Information

After the initial firm period of the charter, Maersk holds a one year extension option at $12,900 per day, followed by a second option at $12,700 per day with a period determined by - and terminating prior to – the vessel’s 25th year drydocking & special survey.

Image of   GSL Arcadia
6,008
Maersk
$18,600

Built: 2001

Yard: Samsung

TEU - Nominal: 6,008

TEU - 14 mt: 4,194

Reefers: 632

LWT: 24,848

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q24

Latest Charter Expiry: 3Q26

Additional Information

After the initial firm period of the charter, Maersk holds a one year extension option at $12,900 per day, followed by a second option at $12,700 per day with a period determined by - and terminating prior to – the vessel’s 25th year drydocking & special survey.

Image of   GSL Melita
6,008
Maersk
$18,600

Built: 2000

Yard: Samsung

TEU - Nominal: 6,008

TEU - 14 mt: 4,193

Reefers: 632

LWT: 24,876

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q24

Latest Charter Expiry: 1Q26

Additional Information

After the initial firm period of the charter, Maersk holds a one year extension option at $12,900 per day, followed by a second option at $12,700 per day with a period determined by - and terminating prior to – the vessel’s 25th year drydocking & special survey.

Image of   GSL MYNY
5,992
Maersk
$18,600

Built: 2001

Yard: Samsung

TEU - Nominal: 5,992

TEU - 14 mt: 4,221

Reefers: 668

LWT: 24,243

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q24

Latest Charter Expiry: 3Q26

Additional Information

After the initial firm period of the charter, Maersk holds a one year extension option at $12,900 per day, followed by a second option at $12,700 per day with a period determined by - and terminating prior to – the vessel’s 25th year drydocking & special survey.

Image of   GSL Dorothea
5,992
Maersk
$18,600

Built: 2001

Yard: Samsung

TEU - Nominal: 5,992

TEU - 14 mt: 4,185

Reefers: 500

LWT: 24,308

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q24

Latest Charter Expiry: 3Q26

Additional Information

After the initial firm period of the charter, Maersk holds a one year extension option at $12,900 per day, followed by a second option at $12,700 per day with a period determined by - and terminating prior to – the vessel’s 25th year drydocking & special survey.

Image of   GSL Tegea
5,936
Maersk
$20,000

Built: 2000

Yard: Kvaerner

TEU - Nominal: 5,936

TEU - 14 mt: 4,312

Reefers: 500

LWT: 25,010

Flag: MI

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q24

Latest Charter Expiry: 2Q24

 

Image of   Tasman
5,936
ZIM
$24,250

Built: 2000

Yard: Kvaerner

TEU - Nominal: 5,936

TEU - 14 mt: 4,312

Reefers: 500

LWT: 25,010

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q24

Latest Charter Expiry: 2Q24

 

Image of   ZIM Europe
5,936
ZIM
$32,500

Built: 2000

Yard: Kvaerner

TEU - Nominal: 5,936

TEU - 14 mt: 4,312

Reefers: 500

LWT: 25,128

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q24

Latest Charter Expiry: 4Q24

Additional Information

Hull optimized for fuel efficiency at lower operating speeds. Chartered at a rate of $14,500 per day to May 2021; thereafter $32,500 per day.

Image of   Ian H
5,470
Maersk
$36,500

Built: 2010

Yard: Zhejang Ouhua

TEU - Nominal: 5,470

TEU @ 14 mt: 3,360

Reefers: 1,200

LWT: 22,529

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q24

Latest Charter Expiry: 4Q27

Additional Information

After the initial firm period of the charter Maersk has the option to extend the charter for three years at $17,250 per day.

Image of   GSL Tinos
5,470
Maersk
$36,500

Built: 2009

Yard: Zhejiang Ouhua

TEU - Nominal: 5,470

TEU @ 14mt: 3,360 

Reefers: 1,200

LWT: 22,259

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q24

Latest Charter Expiry: 4Q27

Additional Information

After the initial firm period of the charter Maersk has the option to extend the charter for three years at $17,250 per day.

Image of   GSL Tripoli
5.470
Maersk
$36,500

Built: 2010

Yard: Zhejiang Ouhua

TEU - Nominal: 5,470

TEU @ 14 mt: 3,360

Reefers: 1,200

LWT: 22,529

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q24

Latest Charter Expiry: 4Q27

Additional Information

After the initial firm period of the charter Maersk has the option to extend the charter for three years at $17,250 per day.

Image of   GSL Syros
5,470
Maersk
$36,500

Built: 2009

Yard: Zhejiang Ouhua

TEU - Nominal: 5,470

TEU @ 14 mt: 3,360

Reefers: 1,200 

LWT: 22,259

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q24

Latest Charter Expiry: 1Q28

Additional Information

After the initial firm period of the charter Maersk has the option to extend the charter for three years at $17,250 per day.

Image of   GSL Kithira
5,095
OOCL
$53,500

Built: 2007

Yard: Hyundai

TEU - Nominal: 5,095

TEU - 14 mt: 3,434

Reefers: 330

LWT: 20,596

Flag: Panama

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q25

Latest Charter Expiry: 2Q25

 

Image of   Dolphin II
5,095
Maersk
$21,000

Built: 2006

Yard: Hyundai

TEU - Nominal: 5,095

TEU - 14 mt: 3,434

Reefers: 330

LWT: 20,633

Flag: Panama

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q24

Latest Charter Expiry: 4Q25

 

Image of   Orca I
5,089
CMA CGM
$35,500

Built: 2007

Yard: Hanjin

TEU - Nominal: 5,089

TEU - 14 mt: 3,350

Reefers: 386

LWT: 20,087

Flag: Panama

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q26

Latest Charter Expiry: 1Q27

 

Image of   CMA CGM Alcazar
5,089
CMA CGM
$35,500

Built: 2007

Yard: Hanjin

TEU - Nominal: 5,089

TEU - 14 mt: 3,350

Reefers: 386

LWT: 19,994

Flag: Malta

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q26

Latest Charter Expiry: 1Q27

 

Image of   GSL Chateau d’If
4,363
CMA CGM

Built: 2008

Yard: Hyundai

TEU - Nominal: 4,363

TEU @ 14 mt: 2,819

Reefers: 600

LWT: 17,309

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q27

Latest Charter Expiry: 1Q28

Additional Information

Charter rate expected to generate average annualized Adjusted EBITDA of approximately $11.2 million

 

Image of   GSL Susan
4,298
CMA CGM

Built: 2006

Yard: Hyundai

TEU - Nominal: 4,298

TEU - 14 mt: 2,810

Reefers: 600

LWT: 17,272

Flag: Malta

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q28

Latest Charter Expiry: 2Q28

Additional Information

Chartered to 1Q23 at $25,350 per day. Forward fixed thereafter for five years +/-45 days at a rate expected to generate average annualized Adjusted EBITDA of approximately $11.2 million
Image of   CMA CGM Jamaica
4,045
CMA CGM

Built: 2006

Yard: CSBC

TEU - Nominal: 4,045

TEU - 14 mt: 2,881

Reefers: 700

LWT: 17,429

Flag: Malta

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q28

Latest Charter Expiry: 2Q28

Additional Information

Chartered to 1Q23 at $25,350 per day. Forward fixed thereafter for five years +/-45 days at a rate expected to generate average annualized Adjusted EBITDA of approximately $11.2 million
Image of   CMA CGM Sambhar
4,045
CMA CGM

Built: 2006

Yard: CSBC

TEU - Nominal: 4,045

TEU - 14 mt: 2,881

Reefers: 700

LWT: 17,428

Flag: Malta

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q28

Latest Charter Expiry: 2Q28

Additional Information

Chartered to 1Q23 at $25,350 per day. Forward fixed thereafter for five years +/-45 days at a rate expected to generate average annualized Adjusted EBITDA of approximately $11.2 million
Image of   CMA CGM America
3,404
Hapag-Lloyd
$21,000

Built: 2013

Yard: Wenchong

TEU - Nominal: 3,404

TEU @ 14 mt: 2,466

Reefers: 538

LWT: 16,209

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q24

Latest Charter Expiry: 3Q24

Additional Information

 

Image of   GSL Melina
3,421
CMA CGM
$20,500

Built: 2014

Yard: Wenchong

TEU - Nominal: 3,421

TEU @ 14 mt: 2,509

Reefers: 506 

LWT: 16,543

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q25

Latest Charter Expiry: 2Q25

Additional Information

 

Image of   GSL Alice
3,421
Gold Star / ZIM
$38,875

Built: 2012

Yard: Rhongcheng Shenfei

TEU - Nominal: 3,421

TEU @ 14 mt: 2,521

Reefers: 538

LWT: 16,309

Flag: Liberia

Post-Panamax

Geared: 

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q26

Latest Charter Expiry: 3Q26

 

Image of   GSL Rossi
2,824
ZIM

Built: 2005

Yard: Hyundai

TEU - Nominal: 2,824

TEU - 14 mt: 2,029

Reefers: 566

LWT: 11,971

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q25

Latest Charter Expiry: 3Q25

Additional Information

Chartered at a rate of $36,000 per day to 2Q2024, and $32,000 per day thereafter.
Image of   GSL Valerie
2,824
Matson
$36,500

Built: 2007

Yard: Hyundai

TEU - Nominal: 2,824

TEU @ 14 mt: 1,952

Reefers: 586

LWT: 11,949

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q25

Latest Charter Expiry: 3Q25

 

Image of   Matson Molokai
3,404
Maersk
$37,975

Built: 2013

Yard: Wenchong

TEU - Nominal: 3,404

TEU @ 14 mt: 2,466

Reefers: 538 

LWT: 16,209

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q25

Latest Charter Expiry: 4Q25

 

Image of   GSL Eleftheria
2,824
MSC
$17,500

Built: 2006

Yard: Hyundai

TEU - Nominal: 2,824

TEU @ 14 mt: 1,952

Reefers: 586

LWT: 11,950

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q24

Latest Charter Expiry: 2Q24

Additional Information

 

Image of   GSL Lalo
2,824
ONE
$35,750

Built: 2007

Yard: Hyundai

TEU @ 14 mt: 2,012

Reefers: 586

LWT: 11, 970

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q24

Latest Charter Expiry: 2Q25

Additional Information

Chartered at $20,250 per day through May 2022, at which time the rate increases to $36,500 per day.

 

Image of   GSL Mercer
2,762
Hapag-Lloyd
$21,500

Built: 2003

Yard: Koyo

TEU - Nominal: 2,762

TEU - 14 mt: 2,330

Reefers: 300

LWT: 13,538

Flag: Panama

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q24

Latest Charter Expiry: 3Q24

Additional Information

Chartered to MSC at a rate of $9,000 per day through April 2021; On expiry of the existing charter Athena will be chartered to Hapag-Lloyd at a rate of $21,500 per day.

Image of   Athena
2,741
Unifeeder
$15,250

Built: 2006

Yard: Aker

TEU - Nominal: 2,741

TEU @ 14 mt: 2,131

Reefers: 400

LWT: 11,507

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q24

Latest Charter Expiry: 2Q24

Additional Information

Image of   GSL Elizabeth
2,546
Westwood (Swire)
$18,200

Built: 2014

Yard: Jiangsu Yangzijiang

TEU - Nominal: 2,546

TEU @ 14 mt: 1,885

Reefers: 536

LWT: 12,245

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q24

Latest Charter Expiry: 2Q24

Additional Information

 

Image of   GSL Maren
2,546
ONE
$33,000

Built: 2012

Yard: Yangzijiang

TEU - Nominal: 2,546

TEU @ 14 mt: 1,885

Reefers: 400 

LWT: 12,212

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q24

Latest Charter Expiry: 1Q25

Additional Information

Chartered at $15,000 per day through November 2021, at which time the rate increases to $33,000 per day.

 

Image of   Beethoven (tbr GSL Chloe)
2,506
Hapag-Lloyd
$16,000

Built: 2000

Yard: Samsung

TEU - Nominal: 2,506

TEU - 14 mt: 1,805

Reefers: 420

LWT: 11,453

Flag: Panama

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 3Q24

Latest Charter Expiry: 4Q24

Additional Information

 

 

Image of   Maira
2,506
CMA CGM
$16,750

Built: 2000

Yard: Samsung

TEU - Nominal: 2,506

TEU - 14 mt: 1,805

Reefers: 420

LWT: 11,370

Flag: Panama

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q24

Latest Charter Expiry: 1Q24

 
Image of   Nikolas
2,506
CMA CGM
$20,700

Built: 2001

Yard: Samsung

TEU - Nominal: 2,506

TEU - 14 mt: 1,805

Reefers: 420

LWT: 11,463

Flag: Panama

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q24

Latest Charter Expiry: 3Q24

 

Image of   Newyorker
2,272
OOCL
$32,000

Built: 2001

Yard: CSBC

TEU - Nominal: 2,272

TEU - 14 mt: 1,735

Reefers: 446

LWT: 11,727

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q24

Latest Charter Expiry: 2Q25

 

Image of   Manet
2,207
CMA CGM
$25,000

Built: 2003

Yard: CSBC

TEU - Nominal: 2,207

TEU - 14 mt: 1,718

Reefers: 350

LWT: 11,731

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q25

Latest Charter Expiry: 1Q25

 

Image of   Keta
2,207
MSC

Built: 2002

Yard: CSBC

TEU - Nominal: 2,207

TEU - 14 mt: 1,718

Reefers: 350

LWT: 11,731

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 2Q25

Latest Charter Expiry: 3Q25

Additional Information

Upon completion of regulatory drydocking in 3Q23, to be chartered to a leading liner company at a rate expected to generate approximately $2.0 million of annualized Adjusted EBITDA

 

Image of   Julie
2,207
Wan Hai
$38,000

Built: 2002

Yard: CSBC

TEU - Nominal: 2,207

TEU - 14 mt: 1,718

Reefers: 350

LWT: 11,791

Flag: Bahamas

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 1Q25

Latest Charter Expiry: 2Q25

 

Image of   Kumasi
2,207
OOCL
$32,000

Built: 2002

Yard: CSBC

TEU - Nominal: 2,207

TEU - 14 mt: 1,718

Reefers: 350

LWT: 11,731

Flag: Liberia

Post-Panamax

Geared

Wide Beam (New Design)

Eco

Scrubber-Fitted

Earliest Charter Expiry: 4Q24

Latest Charter Expiry: 1Q25

Additional Information

Charter rate of $9,300 per day until 4Q21. Thereafter on charter to OOCL at a rate of $32,000 per day

Image of   Akiteta

 

Footnotes

Geared ships are equipped with onboard cranes, allowing them to load and discharge in ports where shoreside infrastructure is limited.

Wide beam improves vessel stability and reduces the need for ballast water, resulting in lower fuel consumption and higher cargo carrying capacity.

At standard operating speeds, fully laden eco-vessels consume 20 - 30 mt per day less fuel than non-eco tonnage, reducing daily running costs for charterers.

High reefer count allows charterers to carry high-margin refrigerated cargo.

Ships fitted with “scrubbers” (Exhaust Gas Cleaning Systems) are permitted to burn fuel with a higher Sulphur content, while still complying with IMO 2020 emission regulations

In many instances, charterers have the option to further extend a charter beyond the nominal latest expiry date by the amount of time that the vessel was off hire during the course of that charter. This additional charter time (“Offhire Extension”) is computed at the end of the initially contracted charter period. The Latest Charter Expiry dates shown in this table have been adjusted to reflect offhire accrued up to the date of issuance of this release plus estimated offhire scheduled to occur during the remaining lifetimes of the respective charters. However, as actual offhire can only be calculated at the end of each charter, in some cases actual Offhire Extensions – if invoked by charterers - may exceed the Latest Charter Expiry Dates indicated.